Electrical power

Electrical power

Salto Grande 500 kV high-voltage power line

Im3 executes a basic and detailed engineering project to change the communications systems for 500 kV lines
The project included:
- 159 km, 500 kV Salto-Colonia Elía line
- 23 km, 500 kV Colonia Elía-San Javier line
- 157 km, 500 kV Salto-San Javier line