{"id":11092,"date":"2022-07-29T07:34:22","date_gmt":"2022-07-29T07:34:22","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/?page_id=11092"},"modified":"2024-06-17T14:08:08","modified_gmt":"2024-06-17T14:08:08","slug":"technical-assistance-in-the-construction-phase-at-the-facilities-of-line-10-of-the-barcelona-metro","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/area-industrial\/technical-assistance-in-the-construction-phase-at-the-facilities-of-line-10-of-the-barcelona-metro\/","title":{"rendered":"Technical assistance in the construction phase at the facilities of Line 10 of the Barcelona Metro"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Technical assistance in the construction phase at the facilities of <strong>Line 10 of the Barcelona Metro<\/strong><\/h2>\n<div>\n<h2>Im3 carries out technical assistance for<strong> line 10<\/strong> of the Barcelona <strong>metro<\/strong><\/h2>\n<\/div>\n<div>\n<pre><\/pre>\n<\/div>\n<div>\n<div>\n<div><\/div>\n<\/div>\n<h2><\/h2>\n<\/div>\n<h3>The resolution of the problems of execution of interfaces with the rest of the subsystems of the railway system was key in the process<\/h3>\n<div>The scope of services performed by Im3 included:<\/div>\n<ul>\n<li>Medium voltage installations 30kV<\/li>\n<li>Ventilation installations for technical rooms and overpressure for emergency exits<\/li>\n<li>Control of fixed installations<\/li>\n<li>Low voltage power distribution installations<\/li>\n<li>Normal and emergency lighting<\/li>\n<\/ul>\n<div style=\"text-align: center;\"><strong>The infrastructures included were the stations of Line-10 of Transports Metropolitans de Barcelona (TMB), corresponding to stations, shafts and tunnel of Section IVb and Section IVc. Gorg, Llefi\u00e0 stations. Salut, Bon Pastor, Sagrera and Onze de Setembre with their tunnel sections and associated ventilation and emergency shafts.<\/strong><\/div>\n","protected":false},"excerpt":{"rendered":"Technical assistance in the construction phase at the facilities of Line 10 of the Barcelona Metro Im3 carries out technical assistance for line 10 of the Barcelona metro The resolution...","protected":false},"author":1,"featured_media":0,"parent":11025,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-11092","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=11092"}],"version-history":[{"count":18,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11092\/revisions"}],"predecessor-version":[{"id":13812,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11092\/revisions\/13812"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11025"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=11092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}