{"id":11157,"date":"2022-04-26T11:03:36","date_gmt":"2022-04-26T11:03:36","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/?page_id=11157"},"modified":"2024-06-13T14:59:14","modified_gmt":"2024-06-13T14:59:14","slug":"electrical-energy","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/electrical-energy\/","title":{"rendered":"Electrical energy"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\"><strong>Electrical<\/strong> energy<\/h2>\n<p style=\"text-align: center; color: white;\">Electric power transmission facilities<\/p>\n<p style=\"text-align: center; color: white;\">Development of engineering projects<\/p>\n<p style=\"color: white; text-align: center;\"><span style=\"color: #ffffff;\">Im3 has been collaborating with Red El\u00e9ctrica de Espa\u00f1a since 2005.<\/span><\/p>\n<p style=\"text-align: center; color: white;\">500 kV Salto Grande high voltage line<\/p>\n<p style=\"text-align: center; color: white;\">Design of HV\/HV, HV\/MV and MV\/MV substations up to 500 kV.<\/p>\n<p style=\"text-align: center; color: white;\"><span style=\"color: #ffffff;\">Engineering of three 220 kV substations of project VI US$ 125,024,000<\/span><\/p>\n<p style=\"text-align: center; color: white;\">Framework engineering contract for high voltage networks up to 220 kV<\/p>\n<p style=\"text-align: center; color: white;\">3-year framework contract (2020-2023) for first international energy player<\/p>\n<p style=\"text-align: center; color: white;\">Network improvement project for EDESUR<\/p>\n<p style=\"text-align: center; color: white;\"><span style=\"color: #ffffff;\">Energy installation and distribution projects<\/span><\/p>\n<p style=\"text-align: center; color: white;\">Electricity distribution in Tanzania<\/p>\n<p style=\"text-align: center; color: white;\">MV-LV network maintenance service in Chile<\/p>\n<p style=\"text-align: center; color: white;\">Full owner\u00b4s engineeing power supply MareNostrum-5 Supercomputer<\/p>\n<p style=\"text-align: center; color: white;\">Integrated project management AT-MT-BT-cartography<\/p>\n<p style=\"text-align: center; color: white;\">Overhead and subway MV-LV projects<\/p>\n<p style=\"text-align: center; color: white;\">Elaboration of MV\/LV projects Enel Cear\u00e1<\/p>\n<p style=\"text-align: center; color: white;\">Drone-supported inspection of facilities<\/p>\n<p style=\"text-align: center; color: white;\"><span style=\"color: #ffffff;\">Regulatory inspection of HV networks in Catalonia<\/span><\/p>\n<p style=\"text-align: center; color: white;\">Inspection of the HV and MV network for the protection of bird life<\/p>\n<p style=\"text-align: center; color: white;\">Inspection, maintenance and construction of 220 kV national transmission lines.<\/p>\n<p style=\"text-align: center; color: white;\">Drone inspection for maintenance of 220 kV PE Sarco 170 MW line<\/p>\n<p style=\"text-align: center; color: white;\"><span style=\"color: #ffffff;\">Framework contract 36 months LV\/MV network maintenance inspection<\/span><\/p>\n<p style=\"text-align: center; color: white;\">The Cobra Chile Group hires im3<\/p>\n<p style=\"text-align: center; color: white;\">Public lighting controller<\/p>\n<p style=\"text-align: center; color: white;\">Solar photovoltaic plant on the roof of water tanks<\/p>\n<p style=\"text-align: center; color: white;\">Renewable wind power generation project<\/p>\n<p style=\"text-align: center; color: white;\">Sierra Gorda Este wind project<\/p>\n<p style=\"text-align: center; color: white;\">Quilapil\u00fan photovoltaic plant 100 MW Chile<\/p>\n","protected":false},"excerpt":{"rendered":"Electrical energy Electric power transmission facilities Development of engineering projects Im3 has been collaborating with Red El\u00e9ctrica de Espa\u00f1a since 2005. 500 kV Salto Grande high voltage line Design of...","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-11157","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=11157"}],"version-history":[{"count":18,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157\/revisions"}],"predecessor-version":[{"id":15112,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157\/revisions\/15112"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=11157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}