{"id":12411,"date":"2022-08-26T10:02:44","date_gmt":"2022-08-26T10:02:44","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/contrato-marco-3-anos-2020-2023-para-first-player-internacional-en-energia\/"},"modified":"2024-07-04T05:43:31","modified_gmt":"2024-07-04T05:43:31","slug":"contrato-marco-3-anos-2020-2023-para-first-player-internacional-en-energia","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/electrical-energy\/contrato-marco-3-anos-2020-2023-para-first-player-internacional-en-energia\/","title":{"rendered":"3-year framework contract (2020-2023) for international first player in energy"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">3-year framework contract (2020-2023) for international first player in energy<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">im3 collaborating with the renewable expansion plan of the French multinational<\/h2>\n<p class=\"title-heading-left\" style=\"text-align: justify;\"><strong>The French multinational Engie awards im3 a 3-year engineering framework contract\u00a0(2020-2023)<br \/>\n<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">To serve the requirements of the Project Implementation Management, which includes the Transmission Management and the Renewable Energies Management, necessary for the evaluation and execution of projects by the electricity company in Chile.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">The Works comprise all the necessary engineering activities for electrical projects of high voltage lines and substations, highlighting the following:<\/p>\n<div class=\"fusion-row\">\n<section id=\"content\" class=\"full-width\">\n<div id=\"post-4730\" class=\"post-4730 page type-page status-publish hentry\">\n<div class=\"post-content\">\n<div class=\"fusion-fullwidth fullwidth-box nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\">\n<div class=\"fusion-builder-row fusion-row \">\n<div class=\"fusion-layout-column fusion_builder_column fusion_builder_column_1_1 fusion-one-full fusion-column-first fusion-column-last 1_1\">\n<div class=\"fusion-column-wrapper\" data-bg-url=\"\">\n<div class=\"fusion-text fusion-text-split-columns fusion-text-columns-2\">\n<ul>\n<li>Discipline of Civil and Structural Works<\/li>\n<li>Transmission Lines Discipline<\/li>\n<li>Discipline Electrical Equipment and Substations<\/li>\n<li>Discipline Control and Protections<\/li>\n<li>Telecommunications Discipline<\/li>\n<li>Discipline of Systemic Studies<\/li>\n<li>Study Scenario<\/li>\n<li>Power Flow Study<\/li>\n<li>Short Circuit Study<\/li>\n<li>Permanent and Transitory Stability Study<\/li>\n<li>Study of Transient Recovery Stresses (TRV)<\/li>\n<li>Protection Coordination and Adjustment Study<\/li>\n<li>Isolation Coordination Study<\/li>\n<li>Bar Capacity Study<\/li>\n<li>Study of Energization of Transmission Systems<\/li>\n<\/ul>\n<\/div>\n<div class=\"fusion-clearfix\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<p>&nbsp;<\/p>\n<div class=\"fusion-footer\">\n<footer class=\"fusion-footer-widget-area fusion-widget-area\" role=\"contentinfo\">\n<div class=\"fusion-row\">\n<div class=\"fusion-columns fusion-columns-4 fusion-widget-area\">\n<div class=\"fusion-column col-lg-3 col-md-3 col-sm-3\"><\/div>\n<\/div>\n<\/div>\n<\/footer>\n<\/div>\n","protected":false},"excerpt":{"rendered":"3-year framework contract (2020-2023) for international first player in energy im3 collaborating with the renewable expansion plan of the French multinational The French multinational Engie awards im3 a 3-year engineering...","protected":false},"author":1,"featured_media":0,"parent":11157,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12411","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12411"}],"version-history":[{"count":7,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12411\/revisions"}],"predecessor-version":[{"id":13997,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12411\/revisions\/13997"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}