{"id":12425,"date":"2022-08-26T09:57:25","date_gmt":"2022-08-26T09:57:25","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/contrato-marco-ingenieria-redes-alta-tension-hasta-220-kv\/"},"modified":"2024-07-03T10:49:36","modified_gmt":"2024-07-03T10:49:36","slug":"contrato-marco-ingenieria-redes-alta-tension-hasta-220-kv","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/contrato-marco-ingenieria-redes-alta-tension-hasta-220-kv\/","title":{"rendered":"High Voltage Networks Engineering Framework Contract up to 220 kV"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">High Voltage Networks Engineering Framework Contract up to 220 kV<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">Ingenieros Emetres develops conceptual, basic and detailed engineering for expansion projects and new high voltage substations and transmission lines<\/h2>\n<p class=\"title-heading-left\" style=\"text-align: justify;\"><strong>The Compa\u00f1\u00eda General de Electricidad is the second largest electricity distribution company in Chile in number of clients, and the first in extension of its distribution area<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">In 2014, the energy company Gas Natural Fenosa (GNF), which would later be renamed Naturgy, acquired CGE.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Ingenieros Emetres has been a provider of design and engineering services for high voltage projects for CGE since 2012, and works administration services (ADO) since 2019.<\/p>\n<p style=\"text-align: justify;\">Ingenieros Emetres was awarded a multi-year framework contract for substation and high-voltage line engineering in 2017. Among the services included in the contract, we can highlight:<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>New high voltage lines.<\/li>\n<li>Modifications of lines on high voltage lines.<\/li>\n<li>Repowering of high voltage lines.<\/li>\n<li>New high voltage substations.<\/li>\n<li>Expansion of high voltage substations.<\/li>\n<li>Standardization of high voltage substations.<\/li>\n<li>Engineering for expansion works projects by decree.<\/li>\n<li>Engineering for the connection of new renewable projects.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"High Voltage Networks Engineering Framework Contract up to 220 kV Ingenieros Emetres develops conceptual, basic and detailed engineering for expansion projects and new high voltage substations and transmission lines The...","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12425","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12425"}],"version-history":[{"count":7,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12425\/revisions"}],"predecessor-version":[{"id":13993,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12425\/revisions\/13993"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}