{"id":12556,"date":"2022-08-18T06:55:52","date_gmt":"2022-08-18T06:55:52","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/estacion-depuradora-de-aguas-residuales\/"},"modified":"2024-06-17T14:15:03","modified_gmt":"2024-06-17T14:15:03","slug":"estacion-depuradora-de-aguas-residuales","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/area-industrial\/estacion-depuradora-de-aguas-residuales\/","title":{"rendered":"Waste water treatment plant"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Waste water treatment plant<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">Im3 executes a construction project for infrastructures at the sewage plant in Prat de Llobregat<\/h2>\n<h3 class=\"title-heading-left\" style=\"text-align: center;\">This involves a twin building project: the sewage plant water line and the sludge line and thermal sludge drying system<\/h3>\n<p style=\"text-align: justify;\">Detail construction plan for the Prat de Llobregat sewage plant water line infrastructure. This includes a MV distribution grid, ancillary and control services and a detail construction plan for the sludge line and thermal sludge drying at the Prat de Llobregat sewage plant. It includes a MV distribution grid, LV grid and ancillary and control services.<\/p>\n","protected":false},"excerpt":{"rendered":"Waste water treatment plant Im3 executes a construction project for infrastructures at the sewage plant in Prat de Llobregat This involves a twin building project: the sewage plant water line...","protected":false},"author":1,"featured_media":0,"parent":11025,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12556","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12556","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12556"}],"version-history":[{"count":5,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12556\/revisions"}],"predecessor-version":[{"id":13905,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12556\/revisions\/13905"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11025"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12556"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}