{"id":12593,"date":"2022-08-26T08:43:33","date_gmt":"2022-08-26T08:43:33","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/im3-empresa-colaboradora-de-red-electrica-de-espana-desde-2005\/"},"modified":"2024-07-04T07:09:05","modified_gmt":"2024-07-04T07:09:05","slug":"im3-empresa-colaboradora-de-red-electrica-de-espana-desde-2005","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/electrical-energy\/im3-empresa-colaboradora-de-red-electrica-de-espana-desde-2005\/","title":{"rendered":"Im3 partner of Red El\u00e9ctrica de Espa\u00f1a (the Spanish national grid) since 2005"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Im3 partner of Red El\u00e9ctrica de Espa\u00f1a (the Spanish national grid) since 2005<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">Im3 ingenieros provides engineering services for electrical power lines, both overhead and underground (400 kV and 220 kV) throughout the country<\/h2>\n<p>Major work throughout the Spanish grid system:<\/p>\n<ul>\n<li>Detailed engineering for 400 kV overhead lines and for 220 kV overhead, underground and mixed lines.<\/li>\n<li>Calculation of lattice structures and special foundations.<\/li>\n<li>Engineering for repowering of power lines.<\/li>\n<li>Survey of facilities.<\/li>\n<li>Electromechanical technical studies and reports using PLscadd and PLSTower software.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"Im3 partner of Red El\u00e9ctrica de Espa\u00f1a (the Spanish national grid) since 2005 Im3 ingenieros provides engineering services for electrical power lines, both overhead and underground (400 kV and 220...","protected":false},"author":1,"featured_media":0,"parent":11157,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12593","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12593"}],"version-history":[{"count":6,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12593\/revisions"}],"predecessor-version":[{"id":13987,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12593\/revisions\/13987"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}