{"id":12708,"date":"2022-07-20T10:56:43","date_gmt":"2022-07-20T10:56:43","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/placas-solares\/"},"modified":"2024-06-25T08:26:11","modified_gmt":"2024-06-25T08:26:11","slug":"placas-solares","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/area-urbana\/placas-solares\/","title":{"rendered":"Solar panels"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\"><span style=\"color: #ffffff;\"><strong>Solar<\/strong> Panels<\/span><\/h2>\n<h2 class=\"title-heading-left\">Im3 carried out the preliminary study, drew up the final plan and managed the work on designing and installing photovoltaic solar panels on several existing buildings.<\/h2>\n<p style=\"text-align: justify;\">Im3 was awarded contracts by various bodies within Barcelona city council (Ag\u00e8ncia de l\u2019Energ\u00eda, Barcelona de Infraestructures Municipals S.A) to conduct a study, draw up the final design and manage work to design and install photovoltaic solar panels over the pergolas in the Saf\u00f3, Joan Cortada and Pilar Mir\u00f3 gardens and on the roof terraces of the Ernest Lluch, Pare Poveda, Bosc de Montju\u00efc, Alexandre Gali, \u00cdtaca and Nab\u00ed schools.\u00a0In all these contracts, the most relevant factor was not in fact the design and calculation of the solar power generating and storage infrastructure but their<\/p>\n<p style=\"text-align: justify;\">adaptation to the existing building. The proper operation of the existing building must be assured, as must the soundness of its structure as it has to bear a series of new loads that were not envisaged in the original design. This may involve designing structural reinforcement to allow the solar panels to be installed in complete safety.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Im3 also carried out the preliminary study and drew up the final plan for the installation of photovoltaic panels on the roof of the workshops at the Martorell Enlla\u00e7 railway station for Ferrocarrils de la Generalitat de Catalunya (FGC).<\/p>\n","protected":false},"excerpt":{"rendered":"Solar Panels Im3 carried out the preliminary study, drew up the final plan and managed the work on designing and installing photovoltaic solar panels on several existing buildings. Im3 was...","protected":false},"author":1,"featured_media":0,"parent":11050,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12708","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12708"}],"version-history":[{"count":7,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12708\/revisions"}],"predecessor-version":[{"id":13956,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12708\/revisions\/13956"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11050"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}