{"id":12822,"date":"2022-08-16T13:44:19","date_gmt":"2022-08-16T13:44:19","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/proyecto-de-eficiencia-energetica-para-indura\/"},"modified":"2024-06-17T14:51:46","modified_gmt":"2024-06-17T14:51:46","slug":"proyecto-de-eficiencia-energetica-para-indura","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/area-industrial\/proyecto-de-eficiencia-energetica-para-indura\/","title":{"rendered":"Energy efficiency design for Indura"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Energy efficiency design for Indura<\/h2>\n<h2 style=\"text-align: center;\">Im3 conducts an energy efficiency study for Indura, Chile<\/h2>\n<p style=\"text-align: justify;\">Indura \u2013 Planta Lirquen, the leading firm in industrial gas and welding, asked for advice on identifying some undesired electrical phenomena that had arisen at this plant.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">Working together with the power supplier, CGE (Compa\u00f1\u00eda General de Electricidad), im3 managed to conduct a synchronised, simultaneous study from the distribution company\u2019s substation to the INDURA substations.<\/p>\n<p style=\"text-align: justify;\">Using applied technology and on the basis of the studies conducted, it was possible to identify the problems. Differentiating between internal and external issues, giving appraisals of energy supply and use, in terms of meeting the minimums the supplier must assure and the conditions in which the customer must receive the power.<\/p>\n","protected":false},"excerpt":{"rendered":"Energy efficiency design for Indura Im3 conducts an energy efficiency study for Indura, Chile Indura \u2013 Planta Lirquen, the leading firm in industrial gas and welding, asked for advice on...","protected":false},"author":1,"featured_media":0,"parent":11025,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12822","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12822"}],"version-history":[{"count":6,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12822\/revisions"}],"predecessor-version":[{"id":13917,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12822\/revisions\/13917"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11025"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}