{"id":12827,"date":"2022-08-31T07:52:01","date_gmt":"2022-08-31T07:52:01","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/proyecto-de-generacion-renovable-eolica\/"},"modified":"2024-07-04T07:56:51","modified_gmt":"2024-07-04T07:56:51","slug":"proyecto-de-generacion-renovable-eolica","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/electrical-energy\/proyecto-de-generacion-renovable-eolica\/","title":{"rendered":"Renewable wind power project"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Renewable wind power project<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">im3 works with the firm EDP on several wind power projects rated at 800 MW<\/h2>\n<p style=\"text-align: justify;\">In renewable power projects im3 worked with the firm EDP on several wind power projects, rated at 800 MW and located in the region of Castilla la Mancha.<\/p>\n<p style=\"text-align: justify;\">The basic connection designs were drawn up, with a 155 km, 400 kV transmission line and the different 30\/220 and 20\/400 kV step-up substations, as well as consulting work and technical advice on the application process to the Spanish national grid operator for connection to the grid.<\/p>\n","protected":false},"excerpt":{"rendered":"Renewable wind power project im3 works with the firm EDP on several wind power projects rated at 800 MW In renewable power projects im3 worked with the firm EDP on...","protected":false},"author":1,"featured_media":0,"parent":11157,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12827","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12827"}],"version-history":[{"count":5,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12827\/revisions"}],"predecessor-version":[{"id":14047,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12827\/revisions\/14047"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}