{"id":12842,"date":"2022-08-31T07:51:57","date_gmt":"2022-08-31T07:51:57","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/proyecto-eolico-sierra-gorda-este\/"},"modified":"2024-07-01T08:09:30","modified_gmt":"2024-07-01T08:09:30","slug":"proyecto-eolico-sierra-gorda-este","status":"publish","type":"page","link":"https:\/\/www.ingenieros-im3.com\/en\/electrical-energy\/proyecto-eolico-sierra-gorda-este\/","title":{"rendered":"Sierra Gorda Este wind power project"},"content":{"rendered":"<h2 style=\"text-align: center; color: white; font-size: 50px;\">Sierra Gorda Este wind power project<\/h2>\n<h2 class=\"title-heading-left\" style=\"text-align: center;\">In Chile, im3 produces the design for the 130 MW Sierra Gorda Este wind farm<\/h2>\n<p style=\"text-align: justify;\">Tender engineering for 40-km 220 kV HV line in the Atacama desert. Study of route, junctions and earmarking. Tender engineering for new line position in the existing substation of Minera Sierra Gorda (Tap-off Spence).<\/p>\n<p style=\"text-align: justify;\">Tender engineering for 130 MW wind farm, including service roads, platforms, MV network, FO and operations and maintenance building. Special design, electrical derating at 2,500 msnm Electrical, electromechanical and civil engineering calculations for transmission line and substation.<\/p>\n","protected":false},"excerpt":{"rendered":"Sierra Gorda Este wind power project In Chile, im3 produces the design for the 130 MW Sierra Gorda Este wind farm Tender engineering for 40-km 220 kV HV line in...","protected":false},"author":1,"featured_media":0,"parent":11157,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full_width.php","meta":{"footnotes":""},"class_list":["post-12842","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12842"}],"version-history":[{"count":7,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12842\/revisions"}],"predecessor-version":[{"id":14058,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/12842\/revisions\/14058"}],"up":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/pages\/11157"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}