{"id":12129,"date":"2021-10-28T05:19:00","date_gmt":"2021-10-28T05:19:00","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/uncategorized\/andes-del-sur-awards-im3-the-works-supervision-of-two-projects\/"},"modified":"2022-12-15T09:40:04","modified_gmt":"2022-12-15T09:40:04","slug":"andes-del-sur-awards-im3-the-works-supervision-of-two-projects","status":"publish","type":"post","link":"https:\/\/www.ingenieros-im3.com\/en\/uncategorized\/andes-del-sur-awards-im3-the-works-supervision-of-two-projects\/","title":{"rendered":"Andes del Sur awards Im3 the works supervision of two projects"},"content":{"rendered":"<\/p>\n<p>28\/10\/2021<\/p>\n<\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"color: #7f7f7f; mso-ansi-language: EN-US;\">Image: aerial view of \u2018Linares\u2019 power substation<\/span><\/p>\n<p class=\"MsoNormal\"><strong><span lang=\"EN-US\" style=\"color: #7f7f7f; mso-ansi-language: EN-US;\">Andes del Sur<\/span><\/strong><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\"> Electricity Consortium awards Im3 Chile with the Technical Inspection of Works (TIW) services for the projects: \u2018San Clemente\u2019 power substation expansion works, and 1x66kV \u2018TAP Linares Norte \u2013 Linares\u2019 overhead line power capacity increase and expansion in \u2018Linares\u2019 power substation, this through decrees designated by the National Electric Coordinator.<\/span><\/p>\n<p class=\"MsoNormal\"><strong><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">OA34 EXPANSION IN \u2018SAN CLEMENTE\u2019 POWER SUBSTATION:<\/span><\/strong><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\"> will consist of increasing the capacity of the \u2018San Clemente\u2019 power substation, by replacing the current 66\/13.8 kV-10 MVA power transformer with a 20 MVA-capacity one. In addition, the project considers the expansion of the medium voltage yard and the construction of two panels for future feeders.<\/span><\/p>\n<p class=\"MsoNormal\"><strong><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">OA35 CAPACITY INCREASE OF 1X66 KV \u2018TAP LINARES NORTE \u2013 LINARES\u2019 OVERHEAD LINE AND EXTENSION IN \u2018LINARES\u2019 POWER SUBSTATION:<\/span><\/strong><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\"> it will consist of increasing the capacity of the 1&#215;66 kV \u2018Tap Linares Norte \u2013 Linares\u2019 overhead line of approximately 2.32 km in length, which currently has one conductor CU 1\/0 AWG, by replacing the current conductor with one that allows a transmission capacity of at least 60 MVA at 35\u00baC with sun.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">In addition, as part of this work, the replacement of the current transformers associated with the 1&#215;66 kV \u2018Tap Linares Norte \u2013 Linares\u2019 overhead line panel in \u2018Linares\u2019 substation is considered. The project includes all the civil works and tasks necessary for the execution and commissioning of the new facilities, such as adjustments in the medium voltage yard, adjustments to the protections, SCADA, civil works, assembly, grounding mesh and tests and commissioning of the new equipment, among others.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">The works to be carried out in the Chilean Maule Region (on land owned by Compa\u00f1\u00eda General de Electricidad, CGE), between the communes of San Clemente and Linares, which are located more than 250 kilometers south of Santiago, will be carried out by Andes del Sur EPC contractor, within a period of approximately 10 months.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">For more information, contact the Manager of the ITOs and ADOs business unit in Chile, Eduardo Mella (<\/span><span lang=\"PT-BR\" style=\"mso-ansi-language: PT-BR;\"><a href=\"mailto:eduardo.mella@im3.cl\"><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">eduardo.mella@im3.cl<\/span><\/a><\/span><span lang=\"EN-US\" style=\"mso-ansi-language: EN-US;\">).<\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>28\/10\/2021 Image: aerial view of \u2018Linares\u2019 power substation Andes del Sur Electricity Consortium awards Im3 Chile with the Technical Inspection of Works (TIW) services for the projects: \u2018San Clemente\u2019 power&#8230;<\/p>\n","protected":false},"author":894,"featured_media":6510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12129","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/894"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12129"}],"version-history":[{"count":1,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12129\/revisions"}],"predecessor-version":[{"id":13427,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12129\/revisions\/13427"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media\/6510"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/categories?post=12129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/tags?post=12129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}