{"id":12193,"date":"2022-03-24T06:52:26","date_gmt":"2022-03-24T06:52:26","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/uncategorized\/im3-participates-in-the-green-hydrogen-megaproject-h2-magallanes\/"},"modified":"2022-11-30T18:04:51","modified_gmt":"2022-11-30T18:04:51","slug":"im3-participates-in-the-green-hydrogen-megaproject-h2-magallanes","status":"publish","type":"post","link":"https:\/\/www.ingenieros-im3.com\/en\/noticias\/im3-participates-in-the-green-hydrogen-megaproject-h2-magallanes\/","title":{"rendered":"Im3 participates in the green hydrogen megaproject H2 Magallanes"},"content":{"rendered":"<\/p>\n<p>24\/03\/2022<\/p>\n<\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">Im3 did work for the Magallanes H2 Green Hydrogen project. The project consists of a generation complex, mainly composed of wind farms, taking advantage of the wind potential and the high factor of a local power plant, in the <em>Magalh\u00e3es and Chilean Antarctica<\/em> Region.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">This project will have up to 10 GW of installed wind capacity, together with up to 8 GW of electricity capacity, a desalination plant, an ammonia plant (NH3) and port facilities to transport green ammonia for the domestic and international markets.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">The objective of the services contracted to Im3 is to carry out the studies to be able to launch the project in 2025, with a view to the production of hydrogen in 2027.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">Im3 developed the modeling parameters and power flow studies to imagine an Independent and Private Interconnected System (SIIP), in the<em> Magallanes<\/em> area, destined to produce green hydrogen.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">The H2 project integrated in DigSilent 1,300 wind turbines located in two areas and the project involved the definition of 8 500\/33 kV substations and the associated transmission lines, as well as relevant complementary generation with ammonia and gas batteries.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-US\">This mega system is in the preliminary conceptual phase and will soon enter the development phase. For more information, contact <span style=\"color: #002060;\">Marcelo Salinas<\/span>.<\/span><\/p>\n<p><span lang=\"EN-US\" style=\"font-size: 11.0pt; line-height: 107%; font-family: 'Calibri',sans-serif; mso-ascii-theme-font: minor-latin; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: 'Times New Roman'; mso-bidi-theme-font: minor-bidi; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;\">See the video of the project: <\/span><span lang=\"PT-BR\" style=\"font-size: 11.0pt; line-height: 107%; font-family: 'Calibri',sans-serif; mso-ascii-theme-font: minor-latin; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: 'Times New Roman'; mso-bidi-theme-font: minor-bidi; mso-ansi-language: PT-BR; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;\"><a href=\"https:\/\/www.youtube.com\/watch?v=wH4GPXtDUdQ\" target=\"_blank\" rel=\"noopener\"><span lang=\"EN-US\">https:\/\/www.youtube.com\/watch?v=wH4GPXtDUdQ<\/span><\/a><\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>24\/03\/2022 Im3 did work for the Magallanes H2 Green Hydrogen project. The project consists of a generation complex, mainly composed of wind farms, taking advantage of the wind potential and&#8230;<\/p>\n","protected":false},"author":894,"featured_media":6599,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-12193","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/894"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12193"}],"version-history":[{"count":0,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12193\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media\/6599"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/categories?post=12193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/tags?post=12193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}