{"id":12236,"date":"2022-06-27T11:11:43","date_gmt":"2022-06-27T11:11:43","guid":{"rendered":"https:\/\/dev.ingenieros-im3.com\/uncategorized\/we-continue-to-advance-as-technical-works-supervision\/"},"modified":"2022-11-30T18:04:54","modified_gmt":"2022-11-30T18:04:54","slug":"we-continue-to-advance-as-technical-works-supervision","status":"publish","type":"post","link":"https:\/\/www.ingenieros-im3.com\/en\/noticias\/we-continue-to-advance-as-technical-works-supervision\/","title":{"rendered":"We continue to advance as Technical Works Supervision"},"content":{"rendered":"<\/p>\n<p>27\/06\/2022<\/p>\n<\/p>\n<p><span lang=\"EN-US\">As Technical Works supervisors we continue to advance in IM3, in expansion of Nueva Valdivia 220 kV power substation project, owned by @Transelec, which consists of the following steps:<\/span><\/p>\n<p><span lang=\"EN-US\">\u27a1<\/span><span lang=\"EN-US\"> The first consists of the installation of a 220\/23 kV, 60 MVA power transformer, with its respective connecting bays at both voltage levels, and the construction of a 23 kV switchyard with a busbar sized for at least 8 feeders and their underground outgoing. This stage contemplates leaving the space for a future second 23 kV busbar with the same characteristics.<\/span><\/p>\n<p><span lang=\"EN-US\">\u27a1<\/span><span lang=\"EN-US\"> The second stage consists of the construction of a 66 kV switchyard in a main and transfer busbars configuration, with space for at least 5 additional bays, the installation of a 220\/66 kV, 60 MVA power transformer with their respective connection bays at both voltage levels, and the underground outgoing of a 66 kV line. The new transformation equipment cannot share the same bay in the 220 kV breaker-and-a-half switchyard, thus connecting through the incorporation of two additional half-bays.<\/span><\/p>\n<p><span lang=\"EN-US\">The work carried out at the Nueva Valdivia power Substation is located more than 800 km south of the Metropolitan Region of Chile, in the Los R\u00edos Region with a rainy climate.<\/span><\/p>\n<p><span lang=\"EN-US\">For more information, contact Eduardo Mella.<\/span><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>27\/06\/2022 As Technical Works supervisors we continue to advance in IM3, in expansion of Nueva Valdivia 220 kV power substation project, owned by @Transelec, which consists of the following steps:&#8230;<\/p>\n","protected":false},"author":894,"featured_media":8451,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-12236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/894"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=12236"}],"version-history":[{"count":0,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/12236\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media\/8451"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=12236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/categories?post=12236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/tags?post=12236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}