{"id":16368,"date":"2024-05-10T05:55:24","date_gmt":"2024-05-10T05:55:24","guid":{"rendered":"https:\/\/ingenieros-im3.com\/?p=16368"},"modified":"2024-05-10T05:57:31","modified_gmt":"2024-05-10T05:57:31","slug":"do-it-now","status":"publish","type":"post","link":"https:\/\/www.ingenieros-im3.com\/en\/news\/do-it-now\/","title":{"rendered":"Do it now!"},"content":{"rendered":"\n\t\t<style>\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-16368 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.ingenieros-im3.com\/wp-content\/uploads\/2024\/05\/Do-it-now.jpeg'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.ingenieros-im3.com\/wp-content\/uploads\/2024\/05\/Do-it-now-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n<p><strong>US Utility\u2019s viewpoint on IEC 61850<\/strong>Our presence at the last IEEE in Anaheim (California) served to learn the opinion of the representatives of the US utilities, who spoke on May 8 about their reasons for adopting IEC 61850, the decisions they\u2019ve made on their current path and what they\u2019ve done and learned at the Industry Viewpoints on IEC 61850 panel, IEEE T&amp;D Conference and Exposition in Anaheim, CA.<\/p>\n<p>The day before, engineer Kirk Tisdal from Salt River Project at the VPAC: Clearing the Path Towards Substation Virtualization session started the sentence \u2018just like energy cannot be destroyed, only can change form, complexity in the substation can\u2019t be eliminated, only moved to another place\u2019 that was finished at the Industry Viewpoints on IEC 61850 on 8 May by engineer Bill Winters form Con Edison saying \u2018the complexity now is in the box\u2019.<\/p>\n<p>John Hart form Duke Energy highlights that \u2018Automation is Automatic\u2019 so relay testing (checking what\u2019s inside the box) must be conducted prior to final installation, and all relay settings must be reset.<\/p>\n<p>Engineer John Bettler from ComEd completes the panel presenting their 61850-training approach so professionals can deal with this \u2018relocated complexity\u2019 and session chair Rich Hunt from Quanta Technology closes the panel indicating that what\u2019s inside the box must be defined: \u2018You don\u2019t get what don\u2019t specify\u2019.<\/p>\n<p>The final message of the panelists is in complete agreement: the future is IEC 61850 but there is work to be done (Planning, Specification, Testing, Training, and more) so you better do it now!<\/p>\n<p>More information: <a href=\"mailto:dsanchez@ingenieros-im3.com\">dsanchez@ingenieros-im3.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>US Utility\u2019s viewpoint on IEC 61850<\/p>\n","protected":false},"author":897,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[68],"tags":[],"class_list":["post-16368","post","type-post","status-publish","format-gallery","hentry","category-news","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/16368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/users\/897"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/comments?post=16368"}],"version-history":[{"count":2,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/16368\/revisions"}],"predecessor-version":[{"id":16370,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/posts\/16368\/revisions\/16370"}],"wp:attachment":[{"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/media?parent=16368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/categories?post=16368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingenieros-im3.com\/en\/wp-json\/wp\/v2\/tags?post=16368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}