High Voltage Networks Engineering Framework Contract up to 220 kV

Ingenieros Emetres develops conceptual, basic and detailed engineering for expansion projects and new high voltage substations and transmission lines

The Compañía General de Electricidad is the second largest electricity distribution company in Chile in number of clients, and the first in extension of its distribution area

 

 

In 2014, the energy company Gas Natural Fenosa (GNF), which would later be renamed Naturgy, acquired CGE.

 

Ingenieros Emetres has been a provider of design and engineering services for high voltage projects for CGE since 2012, and works administration services (ADO) since 2019.

Ingenieros Emetres was awarded a multi-year framework contract for substation and high-voltage line engineering in 2017. Among the services included in the contract, we can highlight:

 

  • New high voltage lines.
  • Modifications of lines on high voltage lines.
  • Repowering of high voltage lines.
  • New high voltage substations.
  • Expansion of high voltage substations.
  • Standardization of high voltage substations.
  • Engineering for expansion works projects by decree.
  • Engineering for the connection of new renewable projects.
logoim3
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.