The Transfer Operation
10/05/2021 The main and transfer bus arrangement does not provide bus-bar redundancy, the transfer bus is a mechanism to 'transfer' the operation of a circuit to a transfer breaker, releasing the...
10/05/2021 The main and transfer bus arrangement does not provide bus-bar redundancy, the transfer bus is a mechanism to 'transfer' the operation of a circuit to a transfer breaker, releasing the...
04/05/2021 Implementation of accurate time synchronization according to IEEE1588 PTPv2 in an entire country from A to Z FEDE 4.0 is the Digital Electrotechnical Energy Forum 4.0, one of the most important...
09/04/2021 Half of the total greenhouse gas (GHG) emissions and more than 90% of the loss of biodiversity and overconsumption of water are due to the extraction and transformation of resources. The...
06/04/2021 The iconography of im3 is made up of a set of graphic representations of key concepts in our paradigm. This is the link to access the video presentation of the new icons:...
28/09/2020 In the last 6 months we have completed a race against the clock to position the digital transformation at the base of our processes, but also at the center of...
25/09/2020 Even in times of a global pandemic, im3 is a solid company that continues to bet on growth, hiring more than 70 professionals in the last 6 months, in addition...
The online Cigré seminar took place on 15 and 16 September with a participation of approximately 280 listeners from several countries. The main focus of the event was energy storage...
im3, following recent years, has collaborated with the solidarity initiative of the A.E. Ramassà in Africa in the world health crisis caused by Covid-19. The club, given the state of...
Rio de Janeiro, June 22, 2020 IM3 Brazil has recently participated in social actions: Installation and maintenance of Micro and Network in Rio de Janeiro and support to needy families affected...
06/12/2020 Larry Orellana is the Head of the Electrical Studies Area of Im3 Chile, he joined the company in November 2013, adding more than 6 years in our engineering firm. Larry is...
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Respond to the survey of the link at the end of the news; in a few days we will have the results May 25,...
Global Energy Services (GES), one of the world leaders in construction and services for the solar and photovoltaic industries, has congratulated the HV lines engineering team of im3 Chile for...
The Health, Safety and Environment (HSE) Inspection service for Enel's building contractors, developed by im3Peru on the basis of the three-year framework contract initiated in July 2019, continues to be...
[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]02/25/2020 im3 opens new offices in Lima, in the Miraflores district, in a new office building with the LEED SILVER (Leadership in Energy and...
On 25 September, im3, with the support of Enel, and while meeting its commitment to actively participate against climate change, financed the planting of trees in the urban space located...
30/05/2019 Luís Roberto Malheiros Júnior and Daniel Sánchez Ruber take office as Country Managers of im3 for Brazil and Peru respectively, in April and May of this year. At the same time,...
24/05/2019 Im3 has been one of the sponsors of the solidarity initiatives that the A.E. Ramassà soccer team deploys every year in a country of Africa. The expedition of the club...
On 30 November, Enel Distribución Perú S.A.A. awarded to im3 the bid of the framework contract "Engineering Service for the Development of MV/LV Projects and PAR and Civil Works”....
On 23 October, Siemens S.A.C. awarded to im3 the development of the project “Detail Engineering for the Implementation of the Capacitor Bank in the Substations Puerto Pizarro 22.9 kV and...
the European Commission (EC) announced that the Barcelona Supercomputing Center (BSC) would be the official site to host the installation of the prestigious MareNostrum 5, one of the most emblematic...